Work included visual Hydraulic Steel Structure (HSS) inspection of stoplogs and tainter gates, 3-D modeling and analysis utilizing STAAD. Pro software, non- destructive testing, structural repair design, welding (per AWS D1.5M/D1.5), corrosion repair, abrasive blasting, lead-based paint removal over and on water, wire rope replacement, cathodic protection removal and installation, and design and replacement of hoist controls and switches and replacement of existing crane with rehab work on the crane rail system. QP1/QP2 certification was required.
Phase 1 of the Huey P Long bridge included the widening and strengthening the bridge substructure. Paragon performed abrasive blasting and painting of the new substructure structural steel. The LADOTD state standard coating system was applied along with a high temperature coating.
Work included visual Hydraulic Steel Structure (HSS) inspection, steel repair/welding (per AWS D1.1M/D1.1), corrosion repair, abrasive blasting, and lead-based paint removal over water. SSPC QP1/QP2 certification was required. Abrasive blast cleaned 3 tainter gates to a SSPC SP-5 and applied multiple coating systems to the tainter gates that included 5-E-Z Vinyl.
Paragon performed abrasive blasting and painting of the historic Sorlie Bridge in South Dakota. The state standard coating system. QP1/QP2 certification was required.
The work consisted of furnishing a floating plant, equipment, supplies, and labor to complete repair and painting of 7 double skin plated Tainter Gates (interior and exterior) at Cheatham Lock and Dam. Additional work covered included fabrication, painting and installation of 2 sets of downstream bulkhead seal angles. QP1/QP2 certification was required. Abrasive blast cleaned 7 tainter gates to a SSPC SP-5 and applied multiple coating systems to the tainter gates that included 5-E-Z Vinyl.
Work included visual Hydraulic Steel Structure (HSS) inspection, steel repair/welding (per AWS D1.1M/D1.1), corrosion repair, abrasive blasting, lead-based paint removal over and on water, cathodic protection removal and installation. SSPC QP1/QP2 certification was required. Abrasive blast cleaned 30 tainter gates to a SSPC SP-5 and applied multiple coating systems to the tainter gates that included 5-E-Z Vinyl.